Saturday 25 May 2013

Here we are now on the 18th week from timber erection.
Underfloor heating is installed 
French drain is dug to try and solve the water seeping in
Roof battening was completed in less than a week 

The kitchen is taking shape

And Budge and Garry screeded downstairs in two and s half days